| Sign In | Join Free | My spintoband.com |
|
Place of Origin : China
Brand Name : YLFDJ
Model Number : 1103A-33TG2
Packaging Details : Packaging Detail: Packed with foam or plywood .
Supply Ability : 500 Set/Sets per Month
Price : Negotiable
Certification : ISO CE
MOQ : 1
Payment Terms : L/C, T/T
Delivery Time : 45 working days
Rated Power : 48kw/60kva
Rated Voltage : 400/230V/110V
Rated Current : 86.4A
Output Type : AC Three Phase
Speed : 1500rpm/1800rpm
Frequency : 50hz/60hz
Engine Brand : Perkins
Color : As Customer require
Controller : Marathon / Stamford / Engga / Faraday
Control mode : Auto / Manul
Cooling System : Water cooled
Starting Method : By Battery
Port : GUANGZHOU, SHENZHEN
| Genset Model | YLGF-48 | |||||
| Genset | Power Capacity (kw/kva) | 48/60 | ||||
| Rated Voltage (V) | 400/230/110 | |||||
| Rated Current (A) | 86.4 | |||||
| Rated Frequency (Hz) | 50/60 | |||||
| Rated Speed (rpm) | 1500/1800 | |||||
| Power Factor / Phase | Cos 0.8 Lagging, 3 phase | |||||
| Cooling System | Closed cycle water-cooled with fan,water tank | |||||
| Overall Dimension (L×W×H) (mm) | 2100x730x 1600 | |||||
| Gross Weight (kg) | 950 | |||||
| Engine Brand | Perkins | |||||
| Diesel Engine |
Engine Model | 1103A-33TG2 | ||||
| Prime Power (kw) | 48/61 | |||||
| Engine Structure | 3 Cylinder,Vertical,Inline,4 stroke | |||||
| Bore×Stroke (mm) | 105x127 | |||||
| Displacement (L) | 3.3 | |||||
| Compression Ratio | 17.25:1 | |||||
| Lube Capacity (L) | 7.9 | |||||
| Fuel System | PT type fuel injection pump | |||||
| Fuel Consumption (g/kw.h) | 215 | |||||
| Lube Consumption (g/kw.h) | 2.5 | |||||
| Rotating Speed (rpm) | 1500/1800 | |||||
| Speed Governing | electric speed governor | |||||
| Starting Method | By 12V batteries | |||||
| Alternator Brand | YLFDJ | |||||
| Alternator | Alternator Model | YLW-48 | ||||
| Insulation Class | Class H | |||||
| Steady Voltage Regulation | ≤ +/- 0.5% | |||||
| Instant Voltage Ragulation | -15%~+20% | |||||
| Voltage Fluctuation Rate | ≤ +/- 0.5% | |||||
| Steady Frequency Regulation | ≤ +/- 0.5% | |||||
| Instant Frequency Ragulation | -7%~+10% | |||||
| Phase/Connection Type | 3 phase 4 wire/Y type | |||||
| Controller | Controller Brand | ZZ6110 | ||||
Payment & Delivery Terms
1.Minimum Order Quantity: 1 set.
2.Packing Details: standard export packing.
3.Delivery Time: 30 working days after receipt of deposit or original L/C.
4.Payment Terms: T/T (30% as deposit,the balance to be paid before delivery) or L/C.
5.Valid time of the quotation: 30 days.
Attachment list
1.Fuel connecting pipes
2.12V DC battery c/w battery cables 2 sets
3.Industrial type silencer c/w stainless steel flexible exhaust bellows
4.Shock absorption rubbers 4 pcs
5.The tool kit and 1 set of manuals (English version).
FAQ
Q: What is your MOQ of this item?
A: Our MOQ is one set generator,EX factory price.For full container order our price is FOB price.
Q: Is it ok to make customers’ own brand name?
A: Sure, we can be your OEM manufacturer with your authorization of brand.
Q: What are your payment terms?
A: 30% T/T deposit, 70% balance before shipment or L/C at sight.
Q: How long is your warranty?
A: 12months or1000 hours basis on the earlier one.
Q: What is the delivery time?
A: 15 work days after receiving your T/T deposit or L/C.
Q: What is your packing way ?
A: Factory standard packing is plastic film, for other packing way should recalculate the packing cost.
|
|
Perkins 1103a-33tg2 Perkins 60 Kva Diesel Generator 48kw AC Three Phase Images |